58,000 Sq. Foot Facility

    Engineering, Administration and AI&T

    19,000 Sq. Foot Class 100K Clean Assembly Area

    95 Person Technically-Weighted Staff

    75% Bachelor and Graduate Degrees in Engineering and Physics

    Compliant with ISO 9001:2000 as Supplemented by AS9100B

    Ambient Thermal Cycle & Thermal-Vacuum Test Chambers

    Precision Laser Metrology System

    Area Pulsed Solar Simulator Test (Multi-Junction Cell Capable)

    Multiple Deployment Fixtures (Up to 60 m)

    Kinematic Support System

    Full Design, Drafting, Structural & Thermal Analysis Software

    Prototype Quick-Reaction Machine Shop

    Personnel Certified to NASA Workmanship Standards


  • Exit Hwy 217 (UCSB) just past Patterson Exit.
    Take first exit at
    Hollister Ave.
    Turn R
    ight onto Hollister Ave.
    Proceed about 4 blocks to
    Pine Ave.
    and turn Left. Able is located on the left side of the street about .5 mile from Hollister Ave.

  • Exit Fairview Ave.
    and turn R
    ight onto Fairview.
    Proceed down the curved hill and turn
    Left onto Hollister Ave.
    Proceed about 2 blocks to
    Pine Ave.
    and turn Right. Able is located on the left side of the street about .5 mile from Hollister Ave.